Torich International Limited--The Steel Tube Maker BS6323 DOM Steel Tube,Seamless DOM Steel Tube,CFS 3/CFS 3A DOM Steel Tube
Title
  • Title
  • جميع
فئة المنتج
الخدمة عبر الإنترنت
http://ar.chinasteeltubepipe.comمسح لزيارة

BS6323 CFS 3/CFS 3A Seamless DOM Steel Tube

حصة ل:  
    سعر الوحدة: USD 1200 / Ton
    الدفع نوع: L/C,T/T,D/P,Paypal,Money Gram,Western Union
    Incoterm: FOB,CFR,CIF,FCA,CPT
    أدني كمية الطلب: 5 Ton
    موعد التسليم: 30 أيام

معلومات أساسية

نموذجBS 6323

علامة تجاريةTORICH

Additional Info

تفاصيل التعبئة والتغليفDOM Seel Tubes are packed in wooden boxes or hexagonal bundles in seaworthy packing.

إنتاجية20000 tons/year

نقلOcean,Land,Air

مكان المنشأChina (Zhejiang)

تفاصيل التجارة القدرة علي التوريد5000Tons per Year

الشهاداتISO9001,ISO14001,TS16949

ميناءShanghai,Ningbo

الدفع نوعL/C,T/T,D/P,Paypal,Money Gram,Western Union

IncotermFOB,CFR,CIF,FCA,CPT

موعد التسليم30 أيام

وصف المنتج

TORICH BS 6323-4 CFS 3/ CFS 3A/ CFS 4 Round Seamless DOM Steel Tube

Product Description:

OD: 5-220 mm

WT: 0.5-25mm

Length: Max 7000mm

Delivery Condition:

1 BK Cold finished(hard)

2 BKW Cold finished(soft)

3 GBK Annealed

4 NBK Normalized

5 GZF Annealed (including de-scaling)

6 NZF Normalized (including de-scaling)

20171108145846_3502720171108145918_3652520171108145958_84910

DOM Steel Tube Production Process:

Raw material → Incoming inspection → Cutting → Heating → Piercing → Hammering →Pickling → Cold-drawing → Heat treatment → Physical chemistry test → Straightening → Ends cutting → Final inspection → Bundling →Storage

QUALITY CONTROL:

1. Incoming Raw Material Inspection
2. Raw Material Segregation to avoid steel grade mix-up
3. Heating and Hammering End for Cold Drawing
4. Cold Drawing and Cold Rolling, on line inspection
5. Heat Treatment, +A, +SRA, +LC, +N, Q+T
6. Straightening-Cutting to specified length-Finished Measuring Inspection
7. Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8. Packing and Stocking


100% of our steel tubes are dimensionally checked
100% of our steel tubes are visually checked to assure they have a perfect surface condition and no surface defects.
100% eddy current test and ultrosonic test to eliminate longitudinal and transversal defects.

FAQ:

Q: Are you trading company or manufacturer ?

A: A professional steel pipes materials inventor, manufacturer and solution provider

Q: How long is your delivery time?

A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples of carbon seamless steel tube ? is it free or extra ?

A: Yes, we could offer the sample for free charge but need pay the cost of freight.

Q: What is your terms of payment ?

A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us

TORICH BS 6323-4 CFS 3/ CFS 3A/ CFS 4 Round Seamless DOM Steel Tube

صورة المنتج
  • BS6323 CFS 3/CFS 3A Seamless DOM Steel Tube
  • BS6323 CFS 3/CFS 3A Seamless DOM Steel Tube
  • BS6323 CFS 3/CFS 3A Seamless DOM Steel Tube
  • BS6323 CFS 3/CFS 3A Seamless DOM Steel Tube
البريد الإلكتروني لهذا المورد
  • *الموضوع:
  • إلى:
    Richard SHEN
    Mr. Richard SHEN
    الدردشة الآن
  • *رسائل:
    يجب أن تكون رسالتك بين 20-8000 الأحرف

اشترك في النشرة الإلكترونية:
الحصول على التحديثات، خصومات وعروض خاصة وجوائز كبيرة!

متعدد اللغات:
حق النشر © 2021 Torich International Limited--The Steel Tube Makerحق الطبعة الملكية
التواصل مع مزود؟المزود
Richard SHEN Mr. Richard SHEN
ماذا يمكنني أن أفعل لك؟
الدردشة الآن الاتصال المورد